in

Post face to post face

in

= 1.5"

in

= 3.75"

in

Drawing only

At the ends

A gap against each post. Standard for balusters between newels.

13 slats across 72"

3 3/4"gap

Slats

13

Gaps

14

Slat material

1.6 ft

3 3/4914 1/419 1/224 3/43035 1/440 1/245 3/45156 1/461 1/266 3/4near edge of each slat, measured from the left end

Marks from the left end

Mark slat edges or centres
Slat 1
3 3/4" → 5 1/4"
Slat 2
9" → 10 1/2"
Slat 3
14 1/4" → 15 3/4"
Slat 4
19 1/2" → 21"
Slat 5
24 3/4" → 26 1/4"
Slat 6
30" → 31 1/2"
Slat 7
35 1/4" → 36 3/4"
Slat 8
40 1/2" → 42"
Slat 9
45 3/4" → 47 1/4"
Slat 10
51" → 52 1/2"
Slat 11
56 1/4" → 57 3/4"
Slat 12
61 1/2" → 63"
Slat 13
66 3/4" → 68 1/4"

Every one of these is measured from the same end of the span, not from the slat before it. Hook the tape once and mark them all — that is what keeps a sixteenth of error from becoming half an inch by the far post.

Other counts

"Passes" here means the 2021 IRC's 4" sphere rule for a residential guard, which is a default rather than law where you are building — your jurisdiction amends it and commercial work answers to a different code. Ring your building department before you cut, not after.

Before you cut anything

Measure the opening at the top and at the bottom. Posts lean, and a bay that is 72" at the rail is often 71 3/4" at the shoe — lay out to the smaller reading and the last gap closes up rather than running out.

The gap here is exact to the thousandth and your saw is not. Cut one slat, hold it in place, and check the first gap against the mark before you cut the other nineteen.